Slab Post-tensioning for bridge at km 3+748 North Tangent, Sofia, Bulgaria (2015)
BENEFICIARY: ROAD AGENCY
GENERAL CONTRACTOR: GLAVBOLGARSTROY AD
PROJECT DETAILS:
- Bridge length: 148.80 m
- Nr. of slabs: 8
- Total surface: 2720 m2
- 15,7mm strand: 22.42 tons
- Length of steel ducts: 3450m
- Freyssinet anchorages 5B15 – 200 pcs
YEAR OF EXECUTION: 2015